Naylor Love have provided the attached update for residents about work on the Bupa care Home being constructed at 122 Churchill Drive.
Dear Neighbours and Residents,
June Update: Bupa Care Facility at 122 Churchill Drive
We would like to thank you for your understanding around the recent early pours, throughout the month of June, there will be six pours commencing at 6:30am, on the following dates:
• Tuesday 2nd June
• Monday 15th June
• Tuesday 16th June
• Tuesday 23rd June
• Wednesday 24th June
• Tuesday 30th June
The pump will arrive on site the day prior to the pour, and as always, we will carefully plan the arrival of every truck to ensure a smooth transition between deliveries, this will any road disruptions as all trucks will enter site immediately upon arrival. To reduce the noise as much as possible, we will position the pump as far away from the gate as we can and place our sound reducing panels around the pump.
You will have seen the Naylor Love teal scrim going up around the building along with the scaffolding. We will be continuing to work around the building as the structural steel goes up. The concrete has been poured throughout the first floor of the first building and we are scheduled to complete the second and third (top) floor by the end of June.
At the South end of the building, we aim to be out of the ground by the end of June. Which will allow us to start erecting the structural steel to the remainder of the building.